DS Smith
Project Scope
This Greenfield Project entailed the installation of a state-of-the-art 550,000-square-foot corrugated boxboard plant in Lebanon, IN. The plant was designed to be the most modern packaging facility in North America and incorporates DS Smith's revolutionary PACE (Performance Assurance Consistency Environment) technology, an innovative PackRight Center, and British Retail Consortium (BRC) Certification. LGL were responsible for installation of the Machine Center Equipment, Piping Fabrication & Installation, Electrical & Instrumentation, HVAC Ventilation Air Systems, Secondary Structural Steel Supply and Erection.
Contract Value
13 M $ US
Location
Lebanon, IN
Industry
Packaging
Year Completed
2020
DS Smith Corrugating Boxboard Project
Solutions
LGL Services Provided
- Electrical / Instrumentation
- HVAC / Sheet Metal
- Modular Assemblies
- Maintenance / Shutdown
- Piping and Pipe Fabrication
- Structural Steel
Modular Assemblies
Structural Steel
Solutions
LGL Services Provided
Let's Connect
Want to learn more about this project? Do you have an RFP? Complete the form below and we will be in touch.
