Anheuser-Bush (InBev)
Anheuser-Bush (InBev)
Project Scope
The scope consisted of the Installation of a New Degassifier removal of an existing Carbon Filter System and installation of a new SS Carbon Filter System and distribution lines. Laframboise Group modularized the assemblies to minimize the labor on-site.
Contract Value
$3M USD
Location
Merrimack, NH
Industry
Beverage
Year Completed
2004
Reference
Degassifier and Water Treatment
Degassifier and Water Treatment
Solutions
Solutions
LGL Services Provided
- Construction Management
- Electrical / Instrumentation
- Modular Assemblies
- Structural Steel
Electrical / Instrumentation
Modular Assemblies
Solutions
Solutions
LGL Services Provided